Two to twelve weeks, and the variable that decides it is almost never the developer. It is how quickly decisions and content come back.

Key Takeaways

  • Two to twelve weeks, and the variable that decides it is almost never the developer.
  • It is how quickly decisions and content come back.
Share:

A rough guide, assuming content is ready and one person can approve things: a brochure site of a few pages in two to three weeks, a business website with a CMS in four to six, an online store in six to ten, and a custom web application from eight weeks upward depending on scope.

Those numbers are achievable and routinely missed, almost always for the same three reasons. None of them is coding speed.

Content is the bottleneck

Design finishes, the build is ready, and the project waits for the text and the photographs.

This is the single largest cause of delay in web projects, and it surprises clients every time because the work sits with them at exactly the moment they assumed the vendor had taken over.

Product descriptions, staff photographs, the About page, the terms, the price list. Each is a small task that nobody has been assigned, so each waits a week for someone with a day job to get to it.

The fix is to start writing content on day one, in parallel with design, and to name one person responsible for delivering it. If you do only one thing from this article, do that.

Too many people approving

A design shown to one person comes back in a day. The same design shown to a committee comes back in two weeks with contradictory notes, and the second round takes longer than the first.

Consultation is reasonable. What matters is that one named person decides afterwards. Projects with a single decision-maker finish measurably sooner than projects where every review is a negotiation.

Scope that grows quietly

A blog gets added in week two. A booking form in week four. Each seems small, and each carries design, build, testing and content behind it.

Additions are fine as long as they are priced and scheduled when they come up rather than absorbed silently. What causes friction is the timeline slipping without anyone connecting it to the four small things that were added.

What the vendor should be doing

Ask for a deployed build you can click at the end of each fortnight rather than a status update. Working software is a fact; a percentage complete is an opinion, and it is the mechanism by which a project is 90% done for two months.

Ask what they need from you and by when, in writing, at the start. A vendor who cannot list that has not planned the project.

How to shorten yours

Before you sign anything: write the text for every page you can, gather the photographs, name one decision-maker, and list the things the site must connect to. That preparation reliably takes weeks off a project, and it costs nothing.

It also improves the result. A site built around content that exists is better than one built around placeholder text that content later has to squeeze into.

Our own shape: a reply within one business day, a thirty-minute call, and a written proposal within three business days with the timeline and its assumptions in it. The assumptions are the part worth reading, because that is where a slipped date usually originates.

Tags:
Timeline
Project
Website
Nepal

Enjoyed this article? Share it with others!

Share:

Written by

AntByte Labs

Engineering · AntByte Labs

AntByte Labs is a Engineering at AntByte Labs, sharing expert insights on technology, software development, and digital innovation to help businesses grow.

StrategyAntByte Labs · antbytelabs.com

Related Posts

Comments (0)

Leave a Comment

Your comment will be visible after moderation. Markdown formatting is supported.